Over the past few days we’ve taken a close look at SFMTA’s newly issued 2025–26 permit for the Hayes Street weekend closure. The rules differ dramatically from last year. Contrary to the perception that “nothing has changed,” the new permit introduces stricter safety requirements, higher operational demands, and new costs — all of which substantially reshape how the block must operate.
In short:
- The 2025–26 permit is more restrictive than any previous version.
- These new requirements mark a significant shift away from the casual, loosely managed model the block has operated under.
Below is a clear breakdown of what changed and what these shifts mean for the neighborhood.
Emergency Lane Requirement: Now Explicit and Non-Negotiable
Last Year’s Permit
The permit required “emergency access” but never defined what that meant.
There was:
- no specified width
- no continuous lane requirement
- no cone requirements
- no prohibition on planters, seating, or installations in the center of the street
As a result, the middle of the roadway was regularly used for programming, seating, and general crowd activity.
New Permit
The permit now requires:
- a continuous 20-foot emergency access lane
- cones placed at regular intervals to mark the lane
- the lane kept clear at all times, with no obstructions
This change alone represents a complete operational shift.
Why it matters:
A properly maintained 20-foot lane is incompatible with the way the block has operated. No planters, no tents, no play installations, and no lingering in the middle of the roadway. This requirement alone essentially ends the past version of the closure.
Tow-Away Signage: A New Weekly Cost Placed on Permit Holder
Last Year
- No tow-away or no-parking signs were required.
- Cars often remained parked along the curb.
- SFMTA did not clear the block of vehicles.
This Year
- Tow-away signs must be installed by SFMTA,
- and the permit holder will be billed for labor and materials.
- Estimated minimum cost: $574 per weekend.
Why it matters:
If tow-away signs are not posted, cars will likely remain in place, making the required 20-foot emergency lane physically impossible. This cost and obligation did not exist in previous years. This is a built-in contradiction that will challenge the closure from week one.
Staffing Requirements: From Loose Oversight to Event-Level Operations
Last Year:
- Barricades technically needed staffing, but it was not enforced.
- No lane monitoring occurred.
- Volunteers handled some tasks — or no one did.
- The street closure predominantly operated unmanaged.
This Year:
- NEW: Continuous monitoring of the coned emergency lane.
- Ongoing staffing at both ends of the block.
- Required vehicle escorts.
- Required cone management and clearing obstructions as they arise.
- Required real-time maintenance of a clear, unobstructed 20-foot lane, which means actively preventing people from lingering or walking through the center.
Why it matters:
This now resembles event-production-level staffing …far beyond the relaxed, lightly monitored street-closure model the block has operated under until now. Every operational responsibility — from parking control to lane management — has increased. None have decreased.
Planters, Vendors, and Installations: Now Require Their Own Permits
Last Year:
- Planters, booths, and ad hoc installations were allowed by default.
- Vendors and pop-ups operated freely without permits.
This Year:
- NEW: such elements now require separate permits.
- NEW: None may obstruct the 20-foot lane; none can be placed mid-block.
Why it matters:
These restrictions remove many of the elements that shaped the previous “open street” aesthetic. Under the new rules, the block must operate more like a controlled access roadway.
Strict Site Plan Conformity
Last Year
The block frequently deviated from the approved site plan and operated flexibly.
This Year
- Strict adherence to the site plan is required.
- Deviations = noncompliance.
Why It Matters
The closure must now operate exactly as SFMTA has drawn — no improvisation; the new model prioritizes repeatable traffic control — not open-street recreation.
What This Means for Hayes Valley
Every major operational responsibility — from parking control to lane management — has increased. None have decreased.
In practical terms, the new permit aligns the closure with a controlled-access emergency corridor, not the informal open-street format the block has followed for years.
The difference is dramatic and the new rules take effect this Friday. We’ll continue monitoring the rollout and documenting how this closure operates under the new conditions. As always, we believe San Franciscans deserve transparency, clarity, and accurate information about how policies impact their neighborhoods.
See the newly issued 2025–26 SFMTA permit below.
See the updated barricade requirements issued with the 2025–26 permit below.